From: route@monster.com
Sent: Monday, October 26, 2015 10:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Mobile: +1 940 765 0998 Skype: carlos.rosas3 E-mail: carlos.crq@gmail.com www.linkedin.com/in/carlosrosas Carlos Rosas
Objective.
Share
and improve my professional experience to get excellent results through a
teamwork in a friendly environment in order to achieve excellent result. Summary.
· Multi-Vendor
Radio Network Engineer Consultant with more than 14 years total in
experience: o
11 years in Ericsson equipment o
3 years in Nokia equipment. · High understanding
on providing Design, Network Roll-Out & Optimization support in GSM,
WCDMA & LTE Networks. · Interested
in new technology, knowledge and activities related to Wireless Telecom
industries. · RF
Consultant and Team Leader in a wide variety of projects in Latin America
(Mexico, Honduras, El Salvador, Brazil), USA (Kansas, Texas, Boston, Alaska,
South Florida, California) & The Caribbean Area (Dominican Republic).
Particularly interested in Optimization Projects. Assignments
USA – IndianaSprint WirelessSolution ArchitectRF OptimizationLTE
& CDMA/EVDO
USA - variousAT&T Wireless Senior RF Post-Launch, RF Opt. and NPILTE
& WCDMA
MéxicoTeMM - TelefónicaRF Team LeaderDesign and Network Roll-OutWCDMA
1900/850MHz
MexicoTelcel - America MovilRF Team LeaderDesign, Network Roll-Out
and RF Optimization WCDMA 850 MHz
Dominq Rep.Claro - America MovilSenior RF Network Roll-Out and RF
Optimization GSM 1900 MHz
USA - TX & CACingular WirelessSenior RF Network Roll-Out and RF
Optimization WCDMA 1900 MHz
USA - TexasCingular Wireless Senior RF RF Optimization & Cabinet
Expansion GSM 1900/800 MHz
USA - KSUnicel – RCC GroupSenior RF Network Roll-Out and RF
Optimization GSM 800 MHz
BrazilTelemig GroupRF Engineer RF Optimization GSM 1800/900 MHz
El SalvadorTelemovilRF EngineerDrive Test GSM 850 MHz
HondurasCeltel - Millicom GroupRF EngineerDesign, Network Roll-Out
and RF Optimization GSM 850 MHz
MexicoTelcel – America MovilTeam LeaderNetwork Roll-Out and RF
Optimization GSM 1900 MHz
Professional Experience.
Nexius Solutions - Indianapolis, USA
Sprint Wireless – Samsung LTE (FDD & TDD), CDMA/EVDO Optimization
project April 2015
– Now Solution
Architect Consultant. RF
LTE Optimization ·Network
Roll-Out processes to deliver the network at a minimum KPI´s required by the
customer. ·Coordination
of RF and Drive Test Engineers to achieve every task on time and with quality
under a friendly environment work. ·Constant
communication and update with the customer in regards to our weekly and
monthly activities/plans. ·Change of
radio and traffic parameters at Cell Level according to consistency checks
and needs on the way of the Roll-Out. ·Optimization
of Load Balance & Layer Management between carriers with different Band
width /
earfcndl
and border cells. ·
RF Shaping to control possible over shooters or identify
cells over tilted, ANR tuning to avoid PCI collision and /or far neighbor
relations added.
·Deployment
of trials to optimize features already in place and new features to come. Ericsson USA
AT&T Wireless –WCDMA & LTE Post-Launch, Network Roll-Out,
Optimization and NPI projects
June 2010– March 2015 Senior
RF Consultant. LTE
Post-Launch (1st, 2nd & 3rd Carrier) ·Optimization
of Load Balance & Layer Management between carriers with different Band
width /
earfcndl
and border cells. ·RF Shaping
to control possible over shooters or identify cells over tilted, ANR tuning
to avoid PCI collision and /or far neighbor relations added. ·Gold
Standard audit to verify Features and eNodeB parameters are align
accordingly. ·Test and
monitoring of new Field Guide Alerts (FGA). ·Delta
report analysis after software upgrade and/or FGA implemented. ·Daily monitoring
and optimization of network KPI's (Acc, Ret, IRAT, TNOL, HO (Intra &
Inter), UL & DL Thrpt) through Business Object ·Troubleshooting
and service performance reporting on worse cells with respect to affected
KPI's through WinFIOL to verify ROP by ROP impact. ·Sanity
check and audits for each cluster to be optimized e. g. RSSI, VSWR &
alarms verification and audits (PLMN Reserved/Cell Barred/ Admin/Op State,
UTRAN & EUTRAN Frequency Relation/Priority, SIB19 (UMTS àLTE), SIB6
(LTE à UMTS),
IFHO – Load Balancing, PCI collision, RET working properly, ·Close-out
reports across the NTX Sub-markets (1C, 2C, 3C & NSB’s) ·RF
parameter change Cell Level according to consistency checks and needs on the
way of the Roll-Out through WinFIOL and/or GUI ·Weekly customer
meeting to report optimization efforts, next actions, worse offenders and
possible trials. LTE
& WCDMA In-Building Tuning and Optimization ·Tuning and
Optimization of several In-Building Solution Projects on 3G and 4G like
Dallas Cowboys Stadium, AA Center, Perot Museum, etc. ·Verification
of proper HO between Macro sites and Indoor cells, proper coverage per
area/zone, PCI per zone. ·Sanity
check and audits for each cluster to be optimized e. g. RSSI, VSWR &
alarms verification and audits (PLMN Reserved/Cell Barred/ Admin/Op State WCDMA
NPI for the NTX Market ·Audit,
Monitoring & Optimization on the worse market RNC’s in order to improve
CQI metric. ·Temporal RF
parameters adjustments according to site alarms that could have a negative
impact on CQI network’s performance. ·Test and
monitoring of Field Guide Alerts at RNC level to later be implemented across
market. ·Weekly
customer meeting to report optimization efforts, next actions, worse
offenders and possible trials. WCDMA
DAS Monitoring & Optimization - Special Events ·DAS
Monitoring & Optimization on several venues like: ·
Orange Bowl, BSC Final at Sun Life Stadium 2013 with
72,073 attendants ·
Formula 1 @ Austin, Tx for three consecutive days with
117,429 attendants ·
Colleagues Stadium (TCU, Floyd Casey, Soldier Stadium,
Texas Tech, Cotton Bowl) with more than 70,000 attendants ·
NFL Stadiums (Dallas Cowboys, BoA - Carolina,
Reliant-Texans, Mercedes Benz – New Orleans) with more than 90,000 attendants ·
Music Festival Events (SXSW) with more than 72,000
attendants ·
The biggest 3G DAS System in all USA at Dallas Cowboys’
Stadium at the Super Bowl XLV with an attendance of 103, 000 people. WCDMA
Network Roll-Out for 3rd and 4th carrier ·Network
Roll-Out processes to deliver the network at a minimum KPI´s required by the
customer for the 3rd and 4th Carrier. ·RF
parameter change Cell Level according to consistency checks and needs on the
way of the Roll-Out. ·Status of
sites, alarms and parameters neighbor definitions, scrambling code, CPICH
power, etc. ·Analysis of
Drive Test (Scrambling Code, Handover-Soft, Softer & Hard- Signal
strength –RSCP- Levels of noise –Ec/No-, etc.) ·Post.
Processing, recommendations and reports of Drive Test data in order to verify
the performance of the different services (HSDPA, AMR, CS64, ISHO) ·Weekly
customer meeting to report optimization efforts, next actions, worse
offenders and possible trials. Nokia Siemens Networks México
Telefónica México Moviles – Telefónica WCDMA 1900 & 850 MHz
Design, Network Roll-Out. January 2010– June 2010 Team
Leader - Senior RF Consultant. WCDMA
Network Roll-Out ·Network
Roll-Out processes to deliver the network at a minimum KPI´s required by the
customer. ·Coordination
of drive test, RF engineers as well other departments like RNC, IP, CORE and
Field Engineers to achieve every task on time and with quality under a
friendly environment work. ·Change of
radio and traffic parameters at Cell Level according to consistency checks
and needs on the way of the Roll-Out. ·Status of
sites, alarms and parameters neighbor definitions, scrambling code, CPICH
power, etc. ·Analysis of
Drive Test (Scrambling Code, Handover-Soft, Softer & Hard- Signal
strength –RSCP- Levels of noise –Ec/No-, etc.) ·Post.
Processing, recommendations and reports of Drive Test data in order to verify
the performance of the different services (HSDPA, AMR, CS64, ISHO) WCDMA Design ·
RF Data fill creation according to the requested services
·Site
Survey, verification and coordination with the field team ·Model
tuning, coordination with the RF Planning Engineers ·Model
Calibration Telcel – America Movil WCDMA 850 MHz Design, Network Roll-Out and
Optimization.
May 2007– January 2010 Team
Leader - Senior RF Consultant. WCDMA
Optimization ·Monitoring
of CE and Tx usage for possible upgrades on resources (2nd system
module and/or Iub capacity) ·Solutions
to special customer request, like commercial launch and VIP events. ·Neighbor
Optimizations for indoor and outdoor cases, intersystem and 3G-3G neighbors
relations ·Optimization
of KPI´s, to reduce number of drops calls, improve coverage by reducing
interference (Ec/Io), recommendations and changes on RF and RNC parameters
levels using Plan Editor. ·Analysis
and solutions to user’s complaints. ·Analysis of
Drive Test events (HO, Call Setups, Releases, Drops, etc.) and L3 messaging
using Actix and NEMO Analyze. ·Technical
recommendations to achieve at least minimum acceptance KPI´s (Change Design,
parameter settings base on Drive Test). WCDMA
Network Roll-Out ·PAC &
FAC(Partial and Final Acceptance Certificate) processes to deliver the
network at a minimum KPI´s required by the customer. ·Coordination
of drive test and RF teams to achieve every task on time and with quality
under a friendly environment work. ·Change of
radio and traffic parameters at Cell Level according to consistency checks
and needs on the way of the Roll-Out. ·Status of
sites, alarms and parameters neighbor definitions, scrambling code, CPICH
power, etc. ·Analysis of
Drive Test (Scrambling Code, Handover-Soft, Softer & Hard- Signal
strength –RSCP- Levels of noise –Ec/No-, etc.) WCDMA Design ·
RF Data fill creation
·Site Survey ·
Monte Carlo Simulations based on an alive GSM network
(AMR & EDGE traffic).
·Model
tuning Ericsson Dominican Republic
Claro GSM 1900 MHz Network Roll-Out and RF Optimization. April
2007– May 2007 Senior
RF Consultant. GSM
Optimization ·Change of
radio and traffic parameters at BSC/Cell Level accordingly to the needs to
maintain and improve KPI performance. GSM
Network Roll-Out ·Sites
status, alarms and check of RF parameters, neighbor definitions, etc. Ericsson USA
Cingular Wireless WCDMA 1900 MHz Network Roll-Out and Optimization.
June 2006– January 2007 Senior
RF Consultant. WCDMA
Optimization ·KPI´s
optimizations, to reduce number of drops calls, improve coverage by reducing
interference and parameters recommendations. ·Analysis of
Drive Test events (HO, Call Setups, Releases, Drops, etc.) and L3 messaging
using Actix and TEMS Inv. ·Technical
recommendations to achieve minimum acceptance KPI´s (Change Design, parameter
settings base on Drive Test). WCDMA
Network Roll-Out ·Status of
sites, alarms and parameters neighbor definitions, scrambling code, CPICH
power, etc. ·Analysis of
Drive Test (Scrambling Code, Handover-Soft, Softer & Hard- Signal
strength –RSCP- Levels of noise –Ec/No-, etc.) NTX Cingular Wireless GSM&EDGE 1900/800 MHz Optimization &
Cabinet Expansion. November 2005 – June 2006 Senior
RF Consultant. GSM
Optimization ·Up-date of
the NTX Cingular’s database for cabinet expansion (Using Remote OMT &
Command Handling). ·Definitions
of IDB according as the predicted grow traffic per cell. ·Definition
and adjustment of RF parameters for the new cabinet expansion and AT&T
sites to Cingular (BSPWRB/T, MAIO, Freq. Hop.). ·Daily
meeting with the drive test team to coordinate the activities according
expansion on sites. ·Consistency
check on RF parameters to assure the well integration of AT&T sites to
the Cingular’s (Using CNA). ·Performance
of the KPI after expansion and integration to avoid possible changes not
predicted and assure the well behavior of the sites into the new (using
R-PMO, Business Object and MRR). ·
Analysis of Drive Test (Quality, SS, Drop Calls, Worse
offender cells, Hand Over).
Unicel GSM&EDGE 800 MHz Network Roll-Out & Optimization (RCC
Group)July 2005 – November 2005 Senior
RF Consultant. GSM
Optimization ·Weekly
Regional meeting to share experience with other markets with similar
problems cases. ·Weekly
Local Meeting to identify, investigate and report weekly activities and goals
according to plan, trial, changes and possible customer complains. ·Change of radio-traffic
parameters at BSC/Cell Level accordingly to the needs to maintain/improve KPI
performance using WinFIOL. ·Optimization
based on reports from statistics (Business Object, MRR, NOX), analysis of
Drive Test (TEMS Investigation) and new sites (Activation and deactivation of
features as TCC, Extended Range, UL/OL, ACCMIN). ·Optimizations
of Dedicated Time Slots according to grow traffic in GPRS/ EDGE vs. Voice
traffic. Based on congestion, public events, holidays and customer
requirements. ·Planning, implementation
and optimization of DYMA & DHA features to give the
customer the maximum traffic capacity vs quality. ·Uses of
scripts for the faster implementation of the parameter to the whole system,
avoiding service interruption. ·Definition
of STS Weekly Reports (Business Object) ·Use of STS
to define and create reports for statistics using Business Object GSM Network Roll-Out ·Weekly
Reports and Customer Meeting achieving minimum KPI. ·Analysis of
Drive Test (Quality, SS, Drop Calls, Worse offenders cells, Hand Over) using
MapInfo and TEMS Investigation. ·Change of
radio and traffic parameters at Cell Level according consistency checks and
needs. Using WinFIOL and Exert. ·Consistency
Check of parameters according to CDD using EXCERT, CNA. ·Load of
parameters from CDD to the BSC using WinFIOL. Ericsson BrazilNovember 2004 – July 2005
Telemig
GSM&EDGE 1800/900 MHz Optimization (Telemig Group) RF
Consultant Engineer. GSM
Optimization ·Change of
radio and traffic parameters at BSC/Cell Level according the ’s needs and to
maintain and improve KPI performance using WinFIOL. ·Optimization
in base of reports from statistics, analysis of Drive Test analysis of KPIs
and new sites. ·Post-processing
of reports from STS. ·Use of STS
to define and create reports for statistics using WinFIOL GSM Network Roll-Out ·Change of
radio and traffic parameters at Cell Level according consistency checks
and needs. Using WinFIOL and Exert. ·Consistency
Check of parameters and features according with CDD using EXCERT. ·Load of
parameters from CDD to the BSC using WinFIOL. Ericsson El Salvador September 2004 – November 2004
Telemovil
GSM 850 Drive Tester (Millicom Group) RF
Consultant Engineer. GSM
Drive Test ·Drive
Testing at Metro Area for TDMA and TEMS technology, comparison between them. ·Cluster
definitions and route creation. ·Post-Processing
of Drive test ·Drive Test
Report and recommendations for optimization. Ericsson Honduras
April 2004 – September 2004
Celtel
GSM 850 Cell Planning Network Roll-Out & Optimization. (Millicom Group) RF Consultant Engineer. ·
Change of radio and traffic parameters at BSC level to
improve and maintain an excellent performance of KPI Check of parameter for new
sites using WinFIOL. ·
Analysis of Drive Test using TEMS Investigation. ·
Check of parameter for new sites using WinFIOL. ·
Nominal Cell Planning of rural sites and principal towns
using TEMS Cell Planner Universal. ·
Neighbor Relations Definitions ·
Frequency Plan For Rural Sites using TEMS Cell Planner
Universal ·
Antenna Selection ·
Selection for candidate sites. ·
Sites surveys. Ericsson México.January 2001–March 2004
Telcel GSM 1900 Optimization (With 22 millions of
customers and the biggest GSM America’s ). RF Consultant Engineer. GSM In Charge of BSC´s Optimization. ·
Change of radio and traffic parameters at BSC level. ·
Recommendations for frequency plan (optimization neighbor
relations, frequencies, etc.) ·
Monitoring of indicators of the BSC (drop calls, quality,
behavior of hand hover, random access, congestion, accessibility, etc.).
Using WinFIOL and ESPA. ·
Recommendations of physical change on sites for a better
behavior of the BSC´s. Supported it on predictions with TEMS Cell Planner. ·
Searching and solution of external interference on the
system. Using Spectrum Analyzer. ·
Indoors Test (measurements of coverage and quality
signal). GSM New sites integrations to the BSC´s.
·
Site Audit ·
Supervision of radio and traffic parameters on new sites. GSM Team Leader Network Roll-Out on the several BSC’s
at Region 9 (Mexico City and surrounded cities) and Region 5. ·
Ensure basic KPIs to guarantee the Network Roll-Out like:
accessibility, HO, Long call and Short call performance, supported on
coverage, best server and interference plots. ·
Site Audit. ·
Supervision of alarm sites for a quick solution. ·
Coordination and Interaction with other teams, for
example: Delivery sites, Site Audit, Drive Test, O&M.
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Portuguese |
Advanced |
|
|
Spanish |
Fluent |
|
|
|